EVERYTHING XIAOMI
Get listed

Uix Page Builder

Uix Page Builder is a free WordPress plugin for building pages and content with a drag-and-drop visual editing interface.

Place
#17 of 32
Score
7.2
Uix Page Builder's website

What Uix Page Builder is

Uix Page Builder is a free WordPress plugin for building pages and content with a drag-and-drop visual editing interface. It describes more than six one-page templates and a set of modules for elements such as menus, parallax, maps, pricing, testimonials, team sections, portfolios, blogs, sliders, accordions, and tabs. You can switch between Visual Builder and Default Editor modes, then save or export custom templates. The builder supports responsive layouts and right-to-left direction, and it is compatible with Gutenberg. Some modules rely on separate plugins: Contact Form needs Contact Form 7, while Uix Products and Uix Slideshow need their corresponding WordPress plugins. Developers can use its form and template API and customize core stylesheets. The plugin lists WordPress 4.2 or higher and PHP 5.6 or higher as requirements. It does not provide theme, popup, or WooCommerce building tools, and its plugin page links to a support forum.

Good

  • Free WordPress plugin with 6+ one-page templates.
  • Offers Visual Builder and Default Editor modes.
  • Supports responsive layouts and right-to-left direction.
  • Compatible with Gutenberg.
  • Custom templates can be saved or exported.

Watch out

  • Contact Form module requires Contact Form 7.
  • Products and Slideshow modules need separate plugins.
  • Requires WordPress 4.2+ and PHP 5.6+.
  • No theme, popup, or WooCommerce building tools.

Who it suits

It suits WordPress users who want a visual way to create pages and content, including responsive layouts or right-to-left direction. Developers may also value its template and form API and customizable stylesheets.

Verdict

Uix Page Builder provides visual page-building tools and a range of content modules for WordPress. Check its software requirements and plugin dependencies, and note that it does not include theme, popup, or WooCommerce builders.

Plans and prices

From Uix Page Builder's own pricing page, checked 14 Oct 2026.

All about pricing
PlanPriceWhat it gives you
Free pluginFreeWordPress plugin · self-hosted installation
Uix Page BuilderFreeWordPress plugin · 6+ one-page templates · 90+ active installations shown

The facts

Each one read from Uix Page Builder's own pages, with the date it was checked.

What it does

Anchor navigation
The plugin can generate anchor links and expose them for WordPress navigation menus.checked 14 Oct 2026
Contact-form integration
The Contact Form module requires Contact Form 7.checked 14 Oct 2026
Custom post types
Portfolio custom-post-type content requires the separate Uix Products plugin.checked 14 Oct 2026
Developer API
The plugin documents a custom form and template API for developers.checked 14 Oct 2026
Developer customization
The plugin describes a custom form and template API and customizable core stylesheets.checked 29 Sep 2026
Documentation
The FAQ points developers to a Uix Page Builder Helper area named For Theme Developer inside WordPress administration.checked 14 Oct 2026
Editor features
Users can switch between Visual Builder and Default Editor modes and save or export custom templates.checked 29 Sep 2026
Gutenberg
The plugin states that it is compatible with Gutenberg.checked 14 Oct 2026
Independent download history
WP Beacon recorded 15,796 total downloads, 90 active installs and version 1.7.5 for the plugin.checked 14 Oct 2026
Independent install estimate
WP-Rankings estimated 99 active installations and recorded 15.7K downloads as of September 5, 2026.checked 14 Oct 2026
Independent ranking
WP-Rankings placed the plugin at rank 16,961 among tracked WordPress plugins.checked 14 Oct 2026
Independent release history
WP Beacon records the plugin as added January 14, 2017, with version 1.7.5 released April 24, 2025.checked 14 Oct 2026
Independent support activity
WP-Rankings showed zero support threads and described development activity as dormant.checked 14 Oct 2026
Independent support metric
WP Beacon reports zero resolved support threads out of zero recorded threads.checked 14 Oct 2026
Independent version status
WP-Rankings listed version 1.7.5 as compatible up to WordPress 7.0.4 and last updated June 12, 2026.checked 14 Oct 2026
Installation
Installation is through the WordPress plugin system or by uploading files into wp-content/plugins, followed by activation.checked 14 Oct 2026
Integrations
The Contact Form module requires the Contact Form 7 plugin, while Uix Products and Uix Slideshow modules require their respective WordPress plugins.checked 29 Sep 2026
Limit: companion plugins
Several advertised modules are unavailable unless separate Uix Products, Uix Slideshow or Contact Form 7 plugins are installed.checked 14 Oct 2026
Limit: ecosystem size
WP Beacon's recorded 90 active installs indicate a small deployed footprint.checked 14 Oct 2026
Limit: security vulnerability
A Singapore government security bulletin lists CVE-2025-24616, a reflected XSS vulnerability affecting versions through 1.7.3, with a 7.1 base score.checked 14 Oct 2026
Modules
Built-in modules include menus, parallax, Google Maps, pricing, features, testimonials, teams, clients, accordions, tabs, portfolios, blogs, sliders and sidebars.checked 14 Oct 2026

Money

Free plan
Yeschecked 23 Sep 2026

The company

Maker
The WordPress directory credits UIUX Lab as the plugin author; its site describes the lab as making web products including WordPress themes and plugins.checked 29 Sep 2026
Maker description
UIUX Lab says it creates WordPress themes and plugins and focuses on accessible web products and interactive design.checked 14 Oct 2026

Alternatives to Uix Page Builder

All alternatives
  1. 1

    Oxygen

    Free planOpen sourceWebAPILinuxmacOS
    8.8Free plan
  2. 2

    Pagelayer

    Free planOpen sourceWebSelf-hosted
    8.2From $59 a year
  3. 3WPBakery Page Builder logo

    WPBakery Page Builder

    Open sourceWebAPISelf-hosted
    8.1
  4. 4

    Brizy AI

    Free planWebAPISelf-hosted
    7.9From $60 a year
  5. 5

    Elementor

    Free planOpen sourceWebAPISelf-hosted
    7.9Free plan
  6. 6Zion Builder logo

    Zion Builder

    Free planWebSelf-hosted
    7.8From $39 a year